195.97/50.13 MAYBE 195.97/50.13 195.97/50.13 Problem: 195.97/50.13 a(x1) -> b(x1) 195.97/50.13 b(a(a(c(x1)))) -> c(c(a(a(a(a(x1)))))) 195.97/50.13 195.97/50.13 Proof: 195.97/50.13 Open 195.97/50.14 EOF