0.00/0.01 YES 0.00/0.01 0.00/0.01 Problem 1: 0.00/0.01 0.00/0.01 (VAR v_NonEmpty:S x1:S) 0.00/0.01 (RULES 0.00/0.01 a(b(a(a(b(b(x1:S)))))) -> a(a(b(a(b(b(a(x1:S))))))) 0.00/0.01 ) 0.00/0.01 0.00/0.01 Problem 1: 0.00/0.01 0.00/0.01 Innermost Equivalent Processor: 0.00/0.01 -> Rules: 0.00/0.01 a(b(a(a(b(b(x1:S)))))) -> a(a(b(a(b(b(a(x1:S))))))) 0.00/0.01 -> The term rewriting system is non-overlaping or locally confluent overlay system. Therefore, innermost termination implies termination. 0.00/0.01 0.00/0.01 0.00/0.01 Problem 1: 0.00/0.01 0.00/0.01 Dependency Pairs Processor: 0.00/0.01 -> Pairs: 0.00/0.01 A(b(a(a(b(b(x1:S)))))) -> A(a(b(a(b(b(a(x1:S))))))) 0.00/0.01 A(b(a(a(b(b(x1:S)))))) -> A(b(a(b(b(a(x1:S)))))) 0.00/0.01 A(b(a(a(b(b(x1:S)))))) -> A(b(b(a(x1:S)))) 0.00/0.01 A(b(a(a(b(b(x1:S)))))) -> A(x1:S) 0.00/0.01 -> Rules: 0.00/0.01 a(b(a(a(b(b(x1:S)))))) -> a(a(b(a(b(b(a(x1:S))))))) 0.00/0.01 0.00/0.01 Problem 1: 0.00/0.01 0.00/0.01 SCC Processor: 0.00/0.01 -> Pairs: 0.00/0.01 A(b(a(a(b(b(x1:S)))))) -> A(a(b(a(b(b(a(x1:S))))))) 0.00/0.01 A(b(a(a(b(b(x1:S)))))) -> A(b(a(b(b(a(x1:S)))))) 0.00/0.01 A(b(a(a(b(b(x1:S)))))) -> A(b(b(a(x1:S)))) 0.00/0.01 A(b(a(a(b(b(x1:S)))))) -> A(x1:S) 0.00/0.01 -> Rules: 0.00/0.01 a(b(a(a(b(b(x1:S)))))) -> a(a(b(a(b(b(a(x1:S))))))) 0.00/0.01 ->Strongly Connected Components: 0.00/0.01 ->->Cycle: 0.00/0.01 ->->-> Pairs: 0.00/0.01 A(b(a(a(b(b(x1:S)))))) -> A(x1:S) 0.00/0.01 ->->-> Rules: 0.00/0.01 a(b(a(a(b(b(x1:S)))))) -> a(a(b(a(b(b(a(x1:S))))))) 0.00/0.01 0.00/0.01 Problem 1: 0.00/0.01 0.00/0.01 Subterm Processor: 0.00/0.01 -> Pairs: 0.00/0.01 A(b(a(a(b(b(x1:S)))))) -> A(x1:S) 0.00/0.01 -> Rules: 0.00/0.01 a(b(a(a(b(b(x1:S)))))) -> a(a(b(a(b(b(a(x1:S))))))) 0.00/0.01 ->Projection: 0.00/0.01 pi(A) = 1 0.00/0.01 0.00/0.01 Problem 1: 0.00/0.01 0.00/0.01 SCC Processor: 0.00/0.01 -> Pairs: 0.00/0.01 Empty 0.00/0.01 -> Rules: 0.00/0.01 a(b(a(a(b(b(x1:S)))))) -> a(a(b(a(b(b(a(x1:S))))))) 0.00/0.01 ->Strongly Connected Components: 0.00/0.01 There is no strongly connected component 0.00/0.01 0.00/0.01 The problem is finite. 0.00/0.01 EOF