199.77/50.46 MAYBE 199.77/50.46 199.77/50.46 Problem: 199.77/50.46 b(a(b(a(x1)))) -> b(a(b(b(x1)))) 199.77/50.46 b(b(b(b(x1)))) -> b(a(a(b(x1)))) 199.77/50.46 a(a(a(b(x1)))) -> b(a(b(a(x1)))) 199.77/50.46 199.77/50.46 Proof: 199.77/50.46 Open 199.77/50.46 EOF